Sistema de reabastecimiento de material entre la planta de ensamble y la planta de corte de tubo en la empresa HAP.

By: Contributor(s): Material type: TextTextPublication details: San José, Costa Rica : J. A. Brenes, 2007.Description: 205 pSubject(s): DDC classification:
  • TCD 2383
Dissertation note: Bachillerato Ingeniería IndustrialTesina Ingeniería IndustrialTutor Ing. Juan Carlos BecklesDisponible solo en Digital
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode
TFG en CD TFG en CD Biblioteca Sede Central San José TCD 2383 (Browse shelf(Opens below)) Available 025611

Bachillerato Ingeniería Industrial

Tesina Ingeniería Industrial

Tutor Ing. Juan Carlos Beckles

Disponible solo en Digital

There are no comments on this title.

to post a comment.